Tested & graded appliance containers · Shipping worldwide, focus: West Africa · Middle East · SE Asia Responses within 12 working hours

← All guides

How do you test the units?

How do you test the units?

Every used unit we sell goes through a 27-point bench test before it's packed, and the result is logged against its serial number. Units are graded A, B, or C based on age and test outcome, and you get the run-test video before you release final payment. Nothing leaves our warehouse untested — new white-label units are checked for function and packaging integrity, used units get the full mechanical and electrical check.

Why this concern is real

Used appliance exports have a bad history in Lagos, Tema, and Mombasa markets: containers arrive with units that don't power on, compressors that seized in transit, or machines that were never tested at all — just cosmetically cleaned and shipped. Buyers who paid 100% upfront have no leverage once the container is on the water. If a supplier tells you "it works" with no serial number, no video, and no grading system, you're buying blind.

How it actually works

A proper pre-export test covers power draw, motor function, timer and control operation, drum/tub balance (for washers), heating element output (for water heaters and microwaves), fan speed stages, and physical housing condition — that's the basis of our 27 checkpoints. Each unit gets a serial number recorded against its test result, so if a claim comes up later, we can pull the exact record. Grading follows test outcome plus age: Grade A units are 3 years old or less and carry a 90-day warranty; Grade B units are up to 5 years old with a 30-day warranty; Grade C units are tested working but sold as-is, no warranty, priced accordingly. Third-party inspectors — SGS, Bureau Veritas, or Intertek — can re-verify any batch at your cost before loading.

How we handle it at Apex Home Export

  • Every used unit is pulled from our 184-factory pre-scanned supplier pool and run through the 27-point bench test on arrival at our Guangzhou facility.
  • Test result and serial number are logged and matched to the unit before it's staged for loading.
  • Unit is graded A, B, or C based on age and test outcome — this grade is stated on your invoice and packing list, not just verbally.
  • At loading, we record a run-test video showing the units powering on and operating, plus the container loading itself.
  • You receive this video and the Bill of Lading copy before your final 70% balance is due — this is our "video before balance" rule, no exceptions.
  • If you want independent verification, SGS, Bureau Veritas, or Intertek can inspect the batch before it's sealed — you cover their fee, we give them full access.

What you should do before you pay

  • Ask for the serial number log and grade breakdown (A/B/C count) for your specific order, not a generic sample sheet.
  • Confirm in writing that you'll receive the run-test video before the 70% balance is released.
  • If ordering Grade A or B units, get the warranty terms (90-day or 30-day) written into your Proforma Invoice.
  • Book a third-party inspector if your order value justifies the cost — we don't discourage this.
  • Never send full payment before loading; our structure is 30% deposit, 70% against B/L copy plus video, and only to the corporate account matching your signed contract entity.

Bottom line: we test, log, grade, and film every unit before you pay the balance — so you're checking our work, not trusting our word. Message us on WhatsApp with your product list and we'll walk you through the test records for that category.